Shandong Haiyang Demonstration Project Phase II

Shandong Haiyang Demonstration Project


Project Content: In 2022, the second phase of the project "Investment Agreement for the Comprehensive Treatment and Recycling of Agricultural Waste in Haiyang City, Low Carbon Environmental Protection Project" will be signed. The project aims to invest in the construction of a large intelligent comprehensive treatment and utilization factory that can absorb 70000 tons of planting and breeding waste, with an estimated annual output of 50000 tons of high-quality solid/liquid organic fertilizers.
  • 案例详细
    • Commodity name: Shandong Haiyang Demonstration Project
    • 副标: Shandong Haiyang Demonstration Project Phase II

    Project Content: In 2022, the second phase of the project "Investment Agreement for the Comprehensive Treatment and Recycling of Agricultural Waste in Haiyang City, Low Carbon Environmental Protection Project" will be signed. The project aims to invest in the construction of a large intelligent comprehensive treatment and utilization factory that can absorb 70000 tons of planting and breeding waste, with an estimated annual output of 50000 tons of high-quality solid/liquid organic fertilizers.

    HESHI

    Energy-based systems

    Rural solid waste and agricultural and forestry planting waste
    HESHI

    Resource system

    Straw branches, tail vegetables with manure

     


     

    Aerial view of Hai Duong Phase II project

    HESHI

    HESHI

    HESHI

     

    Renderings of the core equipment of intelligent factories

    HESHI

    HESHI

    HESHI

    HESHI